IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

730

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0008 # 07 Y:2001 07 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $105,300 $1,212 n/a
NC0212 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $5,685 $25 Implemented
NC0212 # 02 Y:2001 02 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,740 $5,000 Not Implemented
NC0212 # 03 Y:2001 03 2001 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,554 $11,000 Not Implemented
NC0212 # 04 Y:2001 04 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,456 $800 Not Implemented
NC0212 # 05 Y:2001 05 2001 USE OPTIMUM THICKNESS INSULATION $3,300 $5,000 Not Implemented
NC0212 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $392 $120 Not Implemented
NC0212 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,001 $1,589 Not Implemented
NC0212 # 08 Y:2001 08 2001 RECOVER WASTE HEAT FROM EQUIPMENT $6,950 $8,846 Not Implemented
NC0212 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,215 $18,300 Not Implemented
NC0212 # 10 Y:2001 10 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,136 $2,093 Not Implemented
NC0212 # 11 Y:2001 11 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $825 $0 Not Implemented
NV0166 # 01 Y:2000 01 2000 AIR CONDITION ONLY SPACE NECESSARY $32,352 $17,000 n/a
NV0166 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $321 $255 n/a
NV0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $180 $194 n/a
NV0166 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $81 $0 n/a
NV0166 # 05 Y:2000 05 2000 AUTOMATE FINISHING PROCESS $195,000 $3,465 n/a
ND0354 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $355 $240 Implemented
ND0354 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $660 Implemented
ND0354 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,533 $14,644 Implemented
ND0354 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,145 $2,970 Not Implemented
ND0354 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,506 $300 Implemented
ND0354 # 06 Y:2000 06 2000 DEVELOP A REPAIR/REPLACE POLICY $8,446 $27,572 Implemented
ND0354 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $2,685 $6,840 Implemented
ND0354 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,731 $0 Implemented