IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 3433 Heating Equipment, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0537 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $200 Not Implemented
KU0537 # 04 Y:2000 04 2000 METER WASTE WATER $2,980 $1,910 Not Implemented
KU0537 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,180 $1,740 Not Implemented
HO0229 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,928 $20,007 Not Implemented
HO0229 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,032 $700 Not Implemented
HO0229 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,524 $240 Not Implemented
HO0229 # 04 Y:2000 04 2000 CONDENSE OPERATION INTO ONE BUILDING $140,367 $106,000 Not Implemented
HO0229 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $68,250 $500,000 Not Implemented
HO0229 # 06 Y:2000 06 2000 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,899 $20,000 Not Implemented
HO0229 # 07 Y:2000 07 2000 MOVE PRODUCT USING MECHANICAL MEANS $5,850 $10,000 Not Implemented
HO0229 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,850 $3,000 Not Implemented
HO0229 # 09 Y:2000 09 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,200 $4,500 Not Implemented
HO0229 # 10 Y:2000 10 2000 CONDENSE OPERATION INTO ONE BUILDING $4,160 $6,000 Not Implemented
HO0229 # 11 Y:2000 11 2000 CONDENSE OPERATION INTO ONE BUILDING $3,900 $8,000 Not Implemented
HO0229 # 12 Y:2000 12 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,040 $100 Not Implemented
HO0229 # 13 Y:2000 13 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $1,040 $600 Not Implemented
HO0229 # 14 Y:2000 14 2000 RECOVER AND REUSE WASTE MATERIAL $33,000 $3,000 Not Implemented
TP0007 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $300 $987 n/a
TP0007 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $177 $1,095 n/a
TP0007 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,425 $0 n/a
TP0007 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,560 $800 n/a
TP0007 # 03 Y:1999 03 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,254 $2,071 n/a
TP0007 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,504 $20,190 n/a
TP0007 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $9,968 $8,500 n/a
HO0195 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,672 $9,033 Not Implemented