Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
137
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1068 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,629 | $100 | Implemented |
UD1048 # 03 Y:2022 | 03 | 2022 | DISCONNECT BALLASTS | $1,787 | $0 | Implemented |
UD1027 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,842 | $1,000 | Implemented |
UD1027 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,612 | $0 | Implemented |
UD1027 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,013 | $65,250 | Implemented |
UD0945 # 01 Y:2016 | 01 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,063 | $8,000 | Implemented |
UD0945 # 03 Y:2016 | 03 | 2016 | REDUCE FLUID FLOW RATES | $7,163 | $0 | Implemented |
UD0945 # 11 Y:2016 | 11 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,976 | $0 | Implemented |
UD0945 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $623 | $30 | Implemented |
UD0945 # 12 Y:2016 | 12 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $3,983 | $20,370 | Implemented |
UD0945 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $527 | $0 | Implemented |
WV0494 # 08 Y:2014 | 08 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $473 | $438 | Implemented |
WV0494 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,592 | $1,010 | Implemented |
WV0494 # 06 Y:2014 | 06 | 2014 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,149 | $96 | Implemented |
WV0494 # 05 Y:2014 | 05 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,708 | $6,552 | Implemented |
WV0494 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,532 | $51,000 | Implemented |
WV0494 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,724 | $158 | Implemented |
WV0494 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $371 | $1,411 | Implemented |
WV0494 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $511 | $1,289 | Implemented |
WV0470 # 02 Y:2013 | 02 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $16,582 | $68,000 | Implemented |
WV0470 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,069 | $2,050 | Implemented |
WV0470 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $105 | Implemented |
WV0470 # 07 Y:2013 | 07 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,736 | $1,700 | Implemented |
WV0470 # 01 Y:2013 | 01 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,095 | $2,500 | Implemented |
WV0470 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,666 | $1,080 | Implemented |