Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0280 # 05 Y:2022 | 05 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $19,766 | $0 | Implemented |
TT0280 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,150 | $0 | Implemented |
TT0280 # 02 Y:2022 | 02 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $29,003 | $9,880 | Implemented |
TT0280 # 01 Y:2022 | 01 | 2022 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $52,932 | $4,800 | Implemented |
TT0274 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,530 | $0 | Implemented |
TT0274 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,579 | $18,000 | Implemented |
TT0266 # 03 Y:2022 | 03 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,496 | $2,400 | Implemented |
TT0266 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,049 | $1,100 | Implemented |
TT0266 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,458 | $6,147 | Implemented |
TT0266 # 01 Y:2022 | 01 | 2022 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $32,000 | $3,900 | Implemented |
TT0154 # 05 Y:2015 | 05 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $5,176 | $40 | Implemented |
TN0642 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $660 | $2,190 | Implemented |
TN0642 # 04 Y:1998 | 04 | 1998 | REDUCE SCRAP PRODUCTION | $33,515 | $24,000 | Implemented |
TN0642 # 02 Y:1998 | 02 | 1998 | MODIFY CURRENT INCENTIVE PROGRAM | $81,550 | $16,885 | Implemented |
TN0642 # 01 Y:1998 | 01 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $177,600 | $510,000 | Implemented |
TN0642 # 09 Y:1998 | 09 | 1998 | USE SYNTHETIC LUBRICANT | $150 | $0 | Implemented |
TN0642 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $230 | $500 | Implemented |
TN0642 # 07 Y:1998 | 07 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $300 | $0 | Implemented |
TN0603 # 01 Y:1997 | 01 | 1997 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $31,860 | $12,660 | Implemented |
TN0603 # 02 Y:1997 | 02 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $31,200 | $21,000 | Implemented |
TN0603 # 08 Y:1997 | 08 | 1997 | USE A RAG RECYCLE SERVICE | $455 | $0 | Implemented |
TN0603 # 09 Y:1997 | 09 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $120 | $150 | Implemented |
TN0554 # 02 Y:1995 | 02 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $2,636 | $680 | Implemented |
TN0554 # 03 Y:1995 | 03 | 1995 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,379 | $3,800 | Implemented |
TN0554 # 06 Y:1995 | 06 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,625 | $0 | Implemented |