IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0122 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,297 $22,990 Implemented
IP0122 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $54 Implemented
IP0052 # 04 Y:2015 04 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $12,878 $902 Implemented
IP0052 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $12,926 $10,000 Implemented
IP0052 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,077 $47 Implemented
IP0052 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $9 Implemented
IP0052 # 07 Y:2015 07 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,505 $7,153 Implemented
IP0052 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $61 Implemented
IP0013 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,266 $0 Implemented
IP0013 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $192 $0 Implemented
IP0013 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $4,447 $2,744 Implemented
IP0013 # 09 Y:2013 09 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,354 $2,340 Implemented
IP0013 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,491 $15,502 Implemented
IP0002 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,900 $1,320 Implemented
IP0002 # 06 Y:2012 06 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,124 $4,678 Implemented
IP0002 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $18,621 $0 Implemented
IP0002 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,515 $140 Implemented
IC0098 # 02 Y:2005 02 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,945 $13,700 Implemented
IC0098 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,381 $0 Implemented
UM0266 # 10 Y:2004 10 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $666 $610 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 01 Y:2004 01 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,825 $4,500 Implemented