IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0117 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,059 $250 Implemented
UM0117 # 04 Y:1998 04 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,314 $658 Implemented
UM0117 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $724 $1,000 Implemented
UM0117 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,896 $9,124 Implemented
UM0117 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $558 $918 Implemented
AS0220 # 03 Y:1998 03 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,126 $275 Implemented
AS0220 # 04 Y:1998 04 1998 DISCONNECT BALLASTS $355 $15 Implemented
AS0220 # 08 Y:1998 08 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,895 $12,030 Implemented
AS0220 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,801 $100 Implemented
AS0220 # 11 Y:1998 11 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,179 $90 Implemented
AS0220 # 13 Y:1998 13 1998 $495,547 $14,720 Implemented
HO0169 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $777 $800 Implemented
HO0169 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,000 $1,000 Implemented
HO0169 # 07 Y:1998 07 1998 $22,500 $14,400 Implemented
HO0169 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,604 $2,236 Implemented
HO0169 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $4,900 Implemented
HO0169 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $6,192 Implemented
AS0216 # 06 Y:1998 06 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,307 $940 Implemented
AS0216 # 09 Y:1998 09 1998 $35,483 $960 Implemented
AS0216 # 08 Y:1998 08 1998 $2,435 $375 Implemented
KU0490 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,990 $650 Implemented
KU0490 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $2,000 Implemented
KU0490 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $710 $1,510 Implemented
KU0490 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $340 Implemented