Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0222 # 02 Y:2002 | 02 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,074 | $1,750 | Implemented |
UM0222 # 01 Y:2002 | 01 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $28,900 | $10,000 | Implemented |
UM0222 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,900 | $1,275 | Implemented |
WV0225 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $733 | $104 | Implemented |
WV0225 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $453 | $44 | Implemented |
WV0225 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $674 | $386 | Implemented |
WV0225 # 04 Y:2001 | 04 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,177 | $1,320 | Implemented |
WV0225 # 13 Y:2001 | 13 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $275 | $1,044 | Implemented |
WV0225 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,134 | $528 | Implemented |
WV0225 # 10 Y:2001 | 10 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $683 | $250 | Implemented |
WV0225 # 14 Y:2001 | 14 | 2001 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $1,001 | $2,500 | Implemented |
UD0533 # 02 Y:1997 | 02 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,468 | $200 | Implemented |
UD0533 # 08 Y:1997 | 08 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101 | $50 | Implemented |
UD0533 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $36,000 | Implemented |
UD0533 # 05 Y:1997 | 05 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $553 | $750 | Implemented |
UD0533 # 04 Y:1997 | 04 | 1997 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $352 | $50 | Implemented |
UD0533 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,455 | $2,564 | Implemented |
UD0533 # 01 Y:1997 | 01 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $508 | $0 | Implemented |
UD0529 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,396 | $200 | Implemented |
UD0529 # 01 Y:1997 | 01 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $4,259 | $0 | Implemented |
UD0529 # 02 Y:1997 | 02 | 1997 | COMBINE UTILITY METERS | $1,939 | $3,357 | Implemented |
UD0529 # 04 Y:1997 | 04 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $551 | $500 | Implemented |
UD0527 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,177 | $200 | Implemented |
UD0484 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $4,104 | $4,000 | Implemented |
UD0484 # 03 Y:1996 | 03 | 1996 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,391 | $-30,000 | Implemented |