Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
103
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0800 # 06 Y:2020 | 06 | 2020 | USE SYNTHETIC LUBRICANT | $395 | $150 | Implemented |
AM0800 # 03 Y:2020 | 03 | 2020 | PAY UTILITY BILLS ON TIME | $2,148 | $0 | Implemented |
AM0800 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,540 | $40 | Implemented |
AM0800 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,960 | $2,460 | Implemented |
AM0800 # 01 Y:2020 | 01 | 2020 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $487,100 | $3,000 | Implemented |
AM0800 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,700 | $267 | Implemented |
AM0773 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13 | $10 | Implemented |
AM0773 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,768 | $1,000 | Implemented |
AM0773 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,077 | $480 | Implemented |
AM0689 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,740 | $1,840 | Implemented |
AM0689 # 01 Y:2015 | 01 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,100 | $5,270 | Implemented |
AM0689 # 02 Y:2015 | 02 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,595 | $4,000 | Implemented |
AM0689 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,780 | $3,990 | Implemented |
AM0689 # 08 Y:2015 | 08 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $380 | $0 | Implemented |
OK0874 # 06 Y:2014 | 06 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $934 | $1,024 | Implemented |
OK0874 # 02 Y:2014 | 02 | 2014 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $3,364 | $1,568 | Implemented |
OK0874 # 01 Y:2014 | 01 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $380 | $112 | Implemented |
OK0874 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,847 | $980 | Implemented |
OK0874 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,682 | $0 | Implemented |
OK0860 # 12 Y:2013 | 12 | 2013 | INSTALL OCCUPANCY SENSORS | $445 | $3,675 | Implemented |
OK0860 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,722 | $1,750 | Implemented |
AM0586 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,790 | $3,000 | Implemented |
AM0586 # 05 Y:2010 | 05 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $13,725 | $0 | Implemented |
AM0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $950 | $250 | Implemented |
AM0506 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,555 | $8,630 | Implemented |