IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0085 # 05 Y:1996 05 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,180 $9,200 Not Implemented
DS0047 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $2,167 $2,391 Implemented
DS0047 # 02 Y:1996 02 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,884 $5,600 Implemented
DS0047 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $595 $2,186 Implemented
DS0047 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $461 $50 Implemented
DS0047 # 05 Y:1996 05 1996 CONVERT TO ELECTROSTATIC POWDER COATING $7,750 $10,200 Not Implemented
DS0047 # 06 Y:1996 06 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,602 $11,180 Implemented
DS0047 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,493 $1,975 Implemented
AM0252 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,600 $2,105 Implemented
AM0252 # 02 Y:1995 02 1995 INSTALL SKYLIGHTS $1,500 $3,200 Implemented
AM0252 # 03 Y:1995 03 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,060 $0 Not Implemented
AM0252 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $124 Not Implemented
AM0252 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $690 Implemented
AM0252 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $250 $0 Implemented
AM0252 # 07 Y:1995 07 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $75 $370 Implemented
KG0037 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,793 $9,490 Implemented
KG0037 # 02 Y:1995 02 1995 USE SYNTHETIC LUBRICANT $2,390 $0 Implemented
KG0037 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,212 $40 Not Implemented
KG0037 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,622 $750 Implemented
KG0037 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $977 $600 Implemented
KG0037 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $175 Not Implemented
OR0247 # 01 Y:1995 01 1995 UPGRADE CONTROLS ON COMPRESSORS $10,230 $5,900 Implemented
OR0247 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,211 $3,000 Implemented
OR0247 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $374 $521 Implemented
OR0247 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $2,538 $7,200 Not Implemented