IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

685

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0249 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $898 $600 Implemented
AM0374 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,010 $610 Implemented
AM0374 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $78 Implemented
AM0374 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $155 Implemented
SD0242 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,399 $1,960 Implemented
SD0242 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,903 $0 Implemented
SD0242 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,533 $8,500 Implemented
NV0148 # 01 Y:2000 01 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,500 Implemented
NV0148 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,562 $22,374 Implemented
NV0148 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $704 $0 Implemented
SF0180 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,071 $0 Implemented
SF0180 # 03 Y:1999 03 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,900 $0 Implemented
SF0180 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $245 $0 Implemented
SF0180 # 05 Y:1999 05 1999 USE PHOTOCELL CONTROLS $3,661 $2,340 Implemented
SF0180 # 06 Y:1999 06 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $777 $1,087 Implemented
SF0180 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $757 $1,133 Implemented
SF0180 # 08 Y:1999 08 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $303 $644 Implemented
SF0180 # 09 Y:1999 09 1999 USE PHOTOCELL CONTROLS $1,186 $3,960 Implemented
SF0180 # 11 Y:1999 11 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,163 $0 Implemented
NV0138 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $450 Implemented
NV0138 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,007 $400 Implemented
NV0138 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $708 $1,391 Implemented
AM0356 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $5,710 $18,100 Implemented
AM0356 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,570 $1,500 Implemented
AM0356 # 07 Y:1999 07 1999 USE PHOTOCELL CONTROLS $1,960 $150 Implemented