Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1068 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,629 | $100 | Implemented |
UD0945 # 01 Y:2016 | 01 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,063 | $8,000 | Implemented |
UD0945 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $527 | $0 | Implemented |
UD0945 # 03 Y:2016 | 03 | 2016 | REDUCE FLUID FLOW RATES | $7,163 | $0 | Implemented |
UD0945 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $623 | $30 | Implemented |
UD0945 # 11 Y:2016 | 11 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,976 | $0 | Implemented |
UD0945 # 12 Y:2016 | 12 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $3,983 | $20,370 | Implemented |
WV0470 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $105 | Implemented |
WV0470 # 07 Y:2013 | 07 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,736 | $1,700 | Implemented |
WV0470 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,069 | $2,050 | Implemented |
WV0470 # 01 Y:2013 | 01 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,095 | $2,500 | Implemented |
WV0470 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,666 | $1,080 | Implemented |
WV0470 # 02 Y:2013 | 02 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $16,582 | $68,000 | Implemented |
UD0855 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,100 | $0 | Implemented |
UD0855 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,089 | $0 | Implemented |
UD0855 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,118 | $0 | Implemented |
UD0855 # 08 Y:2012 | 08 | 2012 | REDUCE VENTILATION AIR | $2,956 | $6,600 | Implemented |
UD0855 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,665 | $1,000 | Implemented |
UD0845 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $0 | Implemented |
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UD0831 # 03 Y:2011 | 03 | 2011 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,392 | $3,863 | Implemented |
UD0831 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $713 | $10,495 | Implemented |
UD0831 # 07 Y:2011 | 07 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $189 | $240 | Implemented |
UD0831 # 08 Y:2011 | 08 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $137 | $25 | Implemented |
UD0815 # 08 Y:2010 | 08 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $88 | $0 | Implemented |