Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,512
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0002 # 07 Y:2012 | 07 | 2012 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,884 | $0 | Implemented |
UD0855 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,100 | $0 | Implemented |
UD0855 # 02 Y:2012 | 02 | 2012 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,300 | $30,000 | Not Implemented |
UD0855 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,664 | $91,318 | Not Implemented |
UD0855 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,089 | $0 | Implemented |
UD0855 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,665 | $1,000 | Implemented |
UD0855 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,118 | $0 | Implemented |
UD0855 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,886 | $10,493 | Not Implemented |
UD0855 # 08 Y:2012 | 08 | 2012 | REDUCE VENTILATION AIR | $2,956 | $6,600 | Implemented |
UD0855 # 09 Y:2012 | 09 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,362 | $106,738 | Not Implemented |
MI0219 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,003 | $37,014 | Implemented |
MI0219 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,275 | $1,660 | Implemented |
MI0219 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,535 | $1,800 | Implemented |
MI0219 # 04 Y:2012 | 04 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,117 | $4,992 | Not Implemented |
MI0219 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,739 | $6,080 | Implemented |
MI0219 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,042 | $80 | Not Implemented |
MI0219 # 07 Y:2012 | 07 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $895 | $2,320 | Implemented |
MI0219 # 08 Y:2012 | 08 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $734 | $120 | Implemented |
UD0845 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,244 | $500 | Not Implemented |
UD0845 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $0 | Implemented |
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UD0845 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $286 | $1,500 | Not Implemented |
UD0845 # 05 Y:2011 | 05 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $533 | $0 | Not Implemented |
UM0398 # 01 Y:2011 | 01 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,500 | $7,000 | Not Implemented |
UM0398 # 02 Y:2011 | 02 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,496 | $10,350 | Not Implemented |