Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160
matching recommendationsSIC | 3446 | Architectural Metal Work |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0288 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,929 | $2,000 | Implemented |
LE0288 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,326 | $168 | Not Implemented |
LE0288 # 08 Y:2009 | 08 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,311 | $3,200 | Not Implemented |
LE0288 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,531 | $76,000 | Implemented |
LE0288 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,689 | $7,272 | Implemented |
LE0288 # 11 Y:2009 | 11 | 2009 | INSTALL OCCUPANCY SENSORS | $4,090 | $1,890 | Not Implemented |
UU0096 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $840 | $330 | Not Implemented |
UU0096 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,320 | $5,000 | Not Implemented |
UU0096 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $2,530 | $2,040 | Not Implemented |
UU0096 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,320 | $1,950 | Not Implemented |
UU0096 # 05 Y:2005 | 05 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $9,000 | $0 | Not Implemented |
AS0404 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $60,950 | $0 | Not Implemented |
AS0404 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,578 | $45,427 | Not Implemented |
AS0404 # 03 Y:2005 | 03 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,521 | $11,360 | Not Implemented |
AS0404 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,338 | $3,000 | Not Implemented |
AS0404 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,106 | $50 | Not Implemented |
AS0404 # 06 Y:2005 | 06 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $97 | Not Implemented |
UM0251 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $41,018 | $37,327 | n/a |
UM0251 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $35,085 | $20,225 | Implemented |
UM0251 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,517 | $31,338 | n/a |
UM0251 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,376 | $21,876 | n/a |
UM0251 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,592 | $100 | Not Implemented |
UM0251 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,590 | $100 | Implemented |
AM0324 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $28,430 | $104,000 | Implemented |
AM0324 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,000 | $500 | Implemented |