IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 3452 Bolts, Nuts, Rivets, And Washers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0205 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $1,769 Implemented
IC0205 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,439 $0 Implemented
IC0205 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $4,470 Implemented
IC0205 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $30 Implemented
BD0436 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $2,974 $1,500 Implemented
BD0386 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,153 $6,680 Implemented
BD0386 # 14 Y:2011 14 2011 USE EVAPORATION TO CONCENTRATE MATERIAL $6,567 $10,000 Implemented
BD0386 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $221 $285 Implemented
BD0386 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $479 $450 Implemented
BD0386 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $850 Implemented
BD0386 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,876 $4,500 Implemented
BD0386 # 07 Y:2011 07 2011 USE SYNTHETIC LUBRICANT $4,056 $1,500 Implemented
BD0386 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,692 $3,000 Implemented
BD0386 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,230 $3,000 Implemented
BD0386 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,419 $28,476 Implemented
IC0035 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $12,947 $2,657 Implemented
IC0035 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,103 $83,780 Implemented
IC0035 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,977 $4,813 Implemented
IC0035 # 09 Y:2002 09 2002 RECOVER AND REUSE WASTE MATERIAL $97 $120 Implemented
IC0035 # 10 Y:2002 10 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $4,000 $3,500 Implemented
BD0196 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,862 $750 Implemented
BD0196 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $984 $1,725 Implemented
BD0196 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,477 $200 Implemented
WI0370 # 03 Y:2000 03 2000 REPLACE CLOTH RAGS WITH PAPER TOWELS $3,255 $0 Implemented
BD0139 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $275 $410 Implemented