Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,137
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0222 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,491 | $44 | Implemented |
WV0222 # 11 Y:2001 | 11 | 2001 | RECYCLE FLUORESCENT LAMPS | $3,390 | $352 | Implemented |
WV0222 # 12 Y:2001 | 12 | 2001 | $45,760 | $5,000 | Implemented | |
WV0222 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $332 | Implemented |
UD0630 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,607 | $720 | Implemented |
UD0630 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,232 | $5,000 | Implemented |
UD0630 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,449 | $560 | Implemented |
UD0630 # 05 Y:2001 | 05 | 2001 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,639 | $500 | Implemented |
UD0630 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $88 | Implemented |
UD0630 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $611 | $1,180 | Implemented |
UM0192 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $27,600 | $7,600 | Implemented |
UM0192 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,341 | $800 | Implemented |
UM0192 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,130 | $3,850 | Implemented |
UM0192 # 05 Y:2001 | 05 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $700 | $700 | Implemented |
UM0192 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $21,000 | $20,000 | Implemented |
LM0016 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,311 | $3,335 | Implemented |
LM0016 # 05 Y:2001 | 05 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $1,482,000 | $5,000 | Implemented |
LM0016 # 06 Y:2001 | 06 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $340,000 | $310,000 | Implemented |
SD0283 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,393 | $480 | Implemented |
SD0283 # 06 Y:2001 | 06 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $17,992 | $2,300 | Implemented |
SD0283 # 07 Y:2001 | 07 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,044 | $18,000 | Implemented |
SD0279 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,073 | $1,400 | Implemented |
SD0279 # 06 Y:2001 | 06 | 2001 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,667 | $1,000 | Implemented |
SD0279 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $322,709 | $20,000 | Implemented |
CO0482 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,100 | $210 | Implemented |