Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,137
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0222 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,527 | $7,775 | Implemented |
UA0222 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,232 | $92,405 | Implemented |
TR0020 # 01 Y:2020 | 01 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,021 | $0 | Implemented |
TR0020 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,748 | $0 | Implemented |
TR0020 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $558 | $150 | Implemented |
TR0020 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,914 | $3,155 | Implemented |
TR0020 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,445 | $810 | Implemented |
IC0225 # 06 Y:2019 | 06 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $2,596 | $652 | Implemented |
IC0225 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,947 | $3,110 | Implemented |
IC0225 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,274 | $4,150 | Implemented |
IC0225 # 01 Y:2019 | 01 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $44,444 | $23,100 | Implemented |
MI0362 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,441 | $3,600 | Implemented |
MI0362 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,814 | $1,980 | Implemented |
MI0362 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,481 | $185 | Implemented |
MI0362 # 08 Y:2019 | 08 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,148 | $1,126 | Implemented |
MI0362 # 09 Y:2019 | 09 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,147 | $1,090 | Implemented |
MI0362 # 10 Y:2019 | 10 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $288 | $187 | Implemented |
WV0584 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $44,593 | $129,500 | Implemented |
WV0584 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $18,530 | $6,283 | Implemented |
WV0584 # 06 Y:2019 | 06 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $7,129 | $675 | Implemented |
WV0584 # 07 Y:2019 | 07 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,503 | $1,000 | Implemented |
WV0584 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,899 | $510 | Implemented |
WV0584 # 10 Y:2019 | 10 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,028 | $5,443 | Implemented |
WV0584 # 11 Y:2019 | 11 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $876 | $358 | Implemented |
WM0135 # 08 Y:2019 | 08 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,876 | $0 | Implemented |