IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0173 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,924 $880 Implemented
UA0173 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,474 $5,695 Implemented
UA0173 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,811 $150 Implemented
IP0075 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,278 $17,193 Implemented
IP0075 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,854 $77,418 Implemented
SD0538 # 02 Y:2016 02 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $17,613 $46,250 Implemented
SD0538 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,549 $26,272 Implemented
SD0538 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $5,664 $2,520 Implemented
SD0538 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,200 $13,950 Implemented
SD0538 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $952 $750 Implemented
SD0538 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $1,000 Implemented
UD0954 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,273 $0 Implemented
UD0954 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,258 $3,250 Implemented
IP0065 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,132 $8 Implemented
IP0065 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,539 $77 Implemented
IP0065 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,844 $181 Implemented
IP0065 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,873 $422 Implemented
IP0065 # 05 Y:2016 05 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,760 $93 Implemented
IP0065 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $198 Implemented
IP0065 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $840 Implemented
IP0065 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,693 $11,326 Implemented
IP0065 # 12 Y:2016 12 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $548 $957 Implemented
SD0526 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,293 $24,000 Implemented
SD0526 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,809 $31,775 Implemented
SD0526 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,423 $1,500 Implemented