IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

181

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $27,897 $0 Implemented
UD1049 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115,254 $300,000 Implemented
UD1028 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $782 $0 Implemented
UD1028 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $2,814 Implemented
WV0556 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,985 $222 Implemented
WV0556 # 12 Y:2018 12 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $763 $440 Implemented
WV0556 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,065 $9,139 Implemented
WV0556 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $10,210 $20,465 Implemented
WV0556 # 03 Y:2018 03 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,345 $5,620 Implemented
WV0556 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $7,284 $14,250 Implemented
WV0556 # 11 Y:2018 11 2018 DEVELOP A REPAIR/REPLACE POLICY $853 $758 Implemented
WV0556 # 13 Y:2018 13 2018 INSULATE BARE EQUIPMENT $717 $604 Implemented
WV0556 # 10 Y:2018 10 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $864 $124 Implemented
WV0556 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,044 $0 Implemented
UD0954 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,273 $0 Implemented
UD0954 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,258 $3,250 Implemented
WV0520 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $461 $428 Implemented
WV0520 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $780 $1,156 Implemented
WV0520 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,809 $1,589 Implemented
WV0520 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $384 Implemented
WV0520 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,037 $370 Implemented
UD0941 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,738 $14,851 Implemented
UD0941 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $3,537 $50 Implemented
UD0941 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented