IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0105 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,171 $600 Not Implemented
UM0105 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $8,426 $642 Not Implemented
UM0105 # 05 Y:1998 05 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $15,625 $58,992 Implemented
AM0312 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $30,640 $1,200 Implemented
AM0312 # 02 Y:1998 02 1998 REPAIR AND ELIMINATE STEAM LEAKS $24,560 $5,000 Implemented
AM0312 # 03 Y:1998 03 1998 METER WASTE WATER $17,000 $4,800 Implemented
AM0312 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $3,700 $8,650 Implemented
AM0312 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $2,780 $2,790 Implemented
AM0312 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $15 Implemented
AM0312 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,710 $1,250 Implemented
AM0312 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,190 $350 Implemented
AM0312 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $465 $30 Implemented
AM0312 # 10 Y:1998 10 1998 PAY UTILITY BILLS ON TIME $310 $0 Implemented
UM0100 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,265 $28,912 Implemented
UM0100 # 02 Y:1997 02 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $378 $0 Not Implemented
UM0100 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,676 $2,400 Implemented
UM0100 # 04 Y:1997 04 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,306 $16,063 Not Implemented
UM0100 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,519 $38 Not Implemented
WI0306 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $71,719 $240,000 Not Implemented
WI0306 # 02 Y:1997 02 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,278 $500 Not Implemented
WI0306 # 03 Y:1997 03 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,236 $5,000 Not Implemented
WI0306 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $420 $0 Not Implemented
WI0306 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $1,280 Not Implemented
ND0278 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $754 Implemented
ND0278 # 02 Y:1997 02 1997 ADD AREA LIGHTING SWITCHES $327 $200 Implemented