IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0526 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,423 $1,500 Implemented
SD0526 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,809 $31,775 Implemented
SD0526 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,293 $24,000 Implemented
SD0512 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,985 $5,247 Implemented
SD0512 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,224 $2,850 Implemented
SD0512 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,532 $800 Implemented
SD0512 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,185 $45,900 Implemented
SD0512 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,697 $25,608 Implemented
LM0067 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $165 Implemented
LM0067 # 09 Y:2004 09 2004 MODIFY WORKLOAD $81,000 $9,400 Implemented
LM0067 # 08 Y:2004 08 2004 MODIFY WORKLOAD $10,652 $5,500 Implemented
LM0067 # 07 Y:2004 07 2004 MODIFY WORKLOAD $45,760 $570 Implemented
LM0067 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $114 $50 Implemented
LM0067 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $272 $247 Implemented
LM0067 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,647 $2,176 Implemented
LM0067 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,055 $0 Implemented
LM0030 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $115,143 $300 Implemented
SD0216 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,277 $1,650 Implemented
SD0216 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $1,060 Implemented
SD0216 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $840 $0 Implemented