IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0489 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,622 $6,539 Implemented
WV0489 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,585 $0 Implemented
WV0489 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,213 $2,425 Implemented
WV0489 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $271 Implemented
SU0341 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $137 Implemented
SU0341 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $299 $0 Implemented
SU0341 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $314 $0 Implemented
SU0341 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $357 $0 Implemented
SD0464 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,895 $27,250 Implemented
WM0016 # 06 Y:2012 06 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,004 $0 Implemented
WM0016 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,517 $0 Implemented
UM0415 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,600 $1,000 Implemented
UM0415 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $822 $875 Implemented
MZ0096 # 11 Y:2012 11 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $467 $480 Implemented
MZ0096 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $455 $480 Implemented
MZ0096 # 09 Y:2012 09 2012 USE PHOTOCELL CONTROLS $507 $560 Implemented
MZ0096 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $896 $221 Implemented
MZ0096 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,395 $5,400 Implemented
MZ0096 # 05 Y:2012 05 2012 USE RADIANT HEATER FOR SPOT HEATING $11,800 $22,100 Implemented
MZ0096 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,732 $29,201 Implemented
MZ0096 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $57,095 $67,348 Implemented
UD0858 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,006 $500 Implemented
UD0858 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $1,000 Implemented
BD0403 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,988 $5,268 Implemented
BD0403 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,011 $150 Implemented