Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,294
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0215 # 06 Y:1997 | 06 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $30 | Implemented |
AS0215 # 07 Y:1997 | 07 | 1997 | IMPROVE HANDLING PRACTICES | $370 | $0 | Implemented |
MA0400 # 03 Y:1997 | 03 | 1997 | COVER OPEN TANKS | $15,677 | $6,578 | Implemented |
MA0400 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $388 | $0 | Implemented |
AS0205 # 01 Y:1997 | 01 | 1997 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,182 | $2,080 | Implemented |
AS0205 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $815 | $70 | Implemented |
AS0205 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,230 | $1,092 | Implemented |
AS0205 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $714 | $40 | Implemented |
AS0205 # 11 Y:1997 | 11 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,076 | $30 | Implemented |
AS0206 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,330 | $220 | Implemented |
AS0206 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $377 | $60 | Implemented |
AS0206 # 06 Y:1997 | 06 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,352 | $30 | Implemented |
HO0148 # 01 Y:1997 | 01 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,488 | $2,196 | Implemented |
HO0148 # 02 Y:1997 | 02 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,600 | $250 | Implemented |
HO0148 # 03 Y:1997 | 03 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $9,425 | $5,000 | Implemented |
HO0148 # 06 Y:1997 | 06 | 1997 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $10,000 | $10,000 | Implemented |
HO0148 # 07 Y:1997 | 07 | 1997 | APPLY FOR INVESTMENT INCENTIVES | $8,676 | $100 | Implemented |
HO0147 # 02 Y:1997 | 02 | 1997 | INSULATE BARE EQUIPMENT | $1,474 | $2,500 | Implemented |
HO0146 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $616 | $500 | Implemented |
HO0146 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $16,827 | $7,700 | Implemented |
HO0146 # 06 Y:1997 | 06 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $104,000 | $0 | Implemented |
HO0146 # 07 Y:1997 | 07 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $53,760 | $0 | Implemented |
UM0077 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $171 | $150 | Implemented |
UM0077 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,736 | $8,779 | Implemented |
UM0077 # 04 Y:1997 | 04 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,126 | $3,838 | Implemented |