Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1089 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,039 | $2,100 | Implemented |
OK1089 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,064 | $22,000 | Implemented |
OK1089 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,600 | $2,921 | Implemented |
OK1089 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,107 | $2,128 | Implemented |
OK1089 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,067 | $0 | Implemented |
OK1089 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,905 | $14,300 | Implemented |
OK0772 # 05 Y:2009 | 05 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,261 | $17,500 | Implemented |
OK0772 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,160 | $0 | Implemented |
OK0772 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,160 | $0 | Implemented |
OK0772 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,532 | $2,954 | Implemented |
OK0723 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,096 | $42,002 | Implemented |
OK0723 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,876 | $17,879 | Implemented |
OK0723 # 05 Y:2006 | 05 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,531 | $5,250 | Implemented |
OK0723 # 03 Y:2006 | 03 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,135 | $587 | Implemented |
OK0723 # 01 Y:2006 | 01 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $23,600 | $18,000 | Implemented |
OK0674 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,662 | $13,792 | Implemented |
OK0500 # 04 Y:1996 | 04 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $420 | $1,300 | Implemented |
OK0500 # 03 Y:1996 | 03 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $1,125 | $620 | Implemented |
OK0500 # 01 Y:1996 | 01 | 1996 | PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS | $6,013 | $0 | Implemented |
OK0500 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20 | $30 | Implemented |
OK0369 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $0 | Implemented |
OK0369 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,038 | $0 | Implemented |
OK0369 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $990 | Implemented |
OK0218 # 06 Y:1987 | 06 | 1987 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,136 | $503 | Implemented |
OK0218 # 02 Y:1987 | 02 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,933 | $1,500 | Implemented |