Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1089 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,039 | $2,100 | Implemented |
OK1089 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,107 | $2,128 | Implemented |
OK1089 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,067 | $0 | Implemented |
OK1089 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,600 | $2,921 | Implemented |
OK1089 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,905 | $14,300 | Implemented |
OK1089 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,064 | $22,000 | Implemented |
OK0772 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,160 | $0 | Implemented |
OK0772 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,532 | $2,954 | Implemented |
OK0772 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,160 | $0 | Implemented |
OK0772 # 05 Y:2009 | 05 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,261 | $17,500 | Implemented |
OK0723 # 03 Y:2006 | 03 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,135 | $587 | Implemented |
OK0723 # 05 Y:2006 | 05 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,531 | $5,250 | Implemented |
OK0723 # 01 Y:2006 | 01 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $23,600 | $18,000 | Implemented |
OK0723 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,096 | $42,002 | Implemented |
OK0723 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,876 | $17,879 | Implemented |
OK0674 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,662 | $13,792 | Implemented |
OK0500 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20 | $30 | Implemented |
OK0500 # 04 Y:1996 | 04 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $420 | $1,300 | Implemented |
OK0500 # 03 Y:1996 | 03 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $1,125 | $620 | Implemented |
OK0500 # 01 Y:1996 | 01 | 1996 | PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS | $6,013 | $0 | Implemented |
OK0369 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,038 | $0 | Implemented |
OK0369 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $0 | Implemented |
OK0369 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $990 | Implemented |
OK0218 # 06 Y:1987 | 06 | 1987 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,136 | $503 | Implemented |