IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0674 # 03 Y:2003 03 2003 $3,400 $0 Not Implemented
OK0674 # 04 Y:2003 04 2003 $28,500 $40,604 Not Implemented
OK0674 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $143 $184 Not Implemented
OK0500 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20 $30 Implemented
OK0500 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $396 $35 Not Implemented
OK0500 # 04 Y:1996 04 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $420 $1,300 Implemented
OK0500 # 01 Y:1996 01 1996 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $6,013 $0 Implemented
OK0500 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,125 $620 Implemented
OK0500 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,222 $11,250 Not Implemented
OK0369 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $946 $0 Implemented
OK0369 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,038 $0 Implemented
OK0369 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,302 $7,440 Not Implemented
OK0369 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $1,250 $990 Implemented
OK0218 # 05 Y:1987 05 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $780 $465 Implemented
OK0218 # 04 Y:1987 04 1987 COVER OPEN TANKS $7,769 $3,608 Not Implemented
OK0218 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,933 $1,500 Implemented
OK0218 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $1,296 $965 Not Implemented
OK0218 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $291 $255 Implemented
OK0218 # 06 Y:1987 06 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,136 $503 Implemented
OK0218 # 07 Y:1987 07 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,085 $52,000 Not Implemented
OK0199 # 03 Y:1986 03 1986 COVER OPEN TANKS $63,648 $7,814 Not Implemented
OK0199 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $5,271 Implemented
OK0199 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,090 $160 Implemented
OK0199 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $19,130 $14,112 Not Implemented
OK0178 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $1,400 $2,120 Implemented