Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,637
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0106 # 02 Y:2001 | 02 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $399,407 | $1,400,000 | Not Implemented |
SU0106 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,947 | $2,241 | Not Implemented |
SU0106 # 04 Y:2001 | 04 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,158 | $500 | Implemented |
SU0106 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PLANT POWER FACTOR | $3,243 | $10,210 | Implemented |
IC0007 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,050 | $2,125 | Implemented |
IC0007 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,195 | $25,250 | Not Implemented |
IC0007 # 03 Y:2001 | 03 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,066 | $195 | Implemented |
IC0007 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,387 | $18,965 | Not Implemented |
IC0007 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $94 | $372 | Not Implemented |
IC0007 # 06 Y:2001 | 06 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $6,200 | $1,800 | Not Implemented |
IC0007 # 07 Y:2001 | 07 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $9,100 | $35,000 | Not Implemented |
IC0007 # 08 Y:2001 | 08 | 2001 | CLEAR AND RENT EXISTING SPACE | $36,000 | $4,400 | Implemented |
SF0213 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,492 | $0 | Implemented |
SF0213 # 02 Y:2001 | 02 | 2001 | INSULATE BARE EQUIPMENT | $19,198 | $3,152 | Not Implemented |
SF0213 # 03 Y:2001 | 03 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,282 | $950 | Not Implemented |
SF0213 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $106 | $120 | Implemented |
SF0213 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $312 | $1,113 | Implemented |
SF0213 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,159 | $55,000 | Not Implemented |
SF0213 # 07 Y:2001 | 07 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $105,153 | $107,153 | Not Implemented |
UD0613 # 01 Y:2001 | 01 | 2001 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,501 | $15,000 | Not Implemented |
UD0613 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,606 | $14,000 | Implemented |
UD0613 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,566 | $0 | Implemented |
UD0613 # 04 Y:2001 | 04 | 2001 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $5,513 | $5,000 | Implemented |
UD0613 # 05 Y:2001 | 05 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,342 | $0 | Implemented |
WV0208 # 01 Y:2001 | 01 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,153 | $950 | Implemented |