IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0459 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $2,070 Implemented
CO0459 # 10 Y:2000 10 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $600 $0 Implemented
DS0154 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $1,239 $864 Implemented
DS0154 # 04 Y:2000 04 2000 RECYCLE CLEANING SOLVENT AND REUSE $18,740 $17,676 Implemented
DS0154 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,521 $1,336 Implemented
DS0154 # 06 Y:2000 06 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,884 $0 Implemented
SD0230 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $4,048 Implemented
SD0230 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $83,680 $0 Implemented
SD0230 # 07 Y:1999 07 1999 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $27,200 $0 Implemented
SD0230 # 08 Y:1999 08 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $0 $2,410 Implemented
MA0441 # 01 Y:1999 01 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,168 $5,704 Implemented
MA0441 # 02 Y:1999 02 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $43,200 $3,000 Implemented
MA0441 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $789 $0 Implemented
MA0441 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $632 $2,250 Implemented
HO0200 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,818 $7,776 Implemented
HO0200 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,223 $3,065 Implemented
HO0200 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,395 $4,800 Implemented
UD0557 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,942 $12,000 Implemented
UD0557 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,203 $0 Implemented
SD0201 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,033 $1,033 Implemented
SD0201 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,892 $6,734 Implemented
SD0201 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $300 Implemented
SD0201 # 04 Y:1998 04 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,056 $0 Implemented
SD0201 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,080 $0 Implemented
HO0181 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $532 $325 Implemented