Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0444 # 04 Y:2014 | 04 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $6,638 | $5,000 | Implemented |
UM0376 # 10 Y:2010 | 10 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $582 | $6,500 | Implemented |
UM0376 # 09 Y:2010 | 09 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,943 | $2,800 | Implemented |
UM0376 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $248 | $10 | Implemented |
UM0376 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $2,850 | $2,850 | Implemented |
UM0376 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,126 | $2,000 | Implemented |
UM0376 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,793 | $200 | Implemented |
UM0376 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $6,547 | Implemented |
UM0376 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,381 | $9,416 | Implemented |
UM0376 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $7,625 | $250 | Implemented |
UM0376 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,368 | $36,732 | Implemented |
UM0238 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,950 | $150 | Implemented |
UM0238 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,520 | $895 | Implemented |
UM0238 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $6,485 | $8,300 | Implemented |
UM0238 # 02 Y:2003 | 02 | 2003 | COVER OPEN TANKS | $28,130 | $2,624 | Implemented |
UM0062 # 06 Y:1996 | 06 | 1996 | USE SYNTHETIC LUBRICANT | $1,533 | $658 | Implemented |
UM0062 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $100 | Implemented |
UM0062 # 03 Y:1996 | 03 | 1996 | OPTIMIZE PLANT POWER FACTOR | $10,881 | $250 | Implemented |
UM0062 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,893 | $4,042 | Implemented |
UM0062 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $616 | $718 | Implemented |
ND0219 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,069 | $600 | Implemented |
ND0219 # 06 Y:1995 | 06 | 1995 | CONVERT TO ELECTROSTATIC POWDER COATING | $17,600 | $24,500 | Implemented |
ND0219 # 05 Y:1995 | 05 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $42,622 | $50,000 | Implemented |
ND0219 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,277 | $1,180 | Implemented |
ND0219 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,443 | $2,720 | Implemented |