IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0540 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,287 $713 Implemented
WV0540 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $2,370 Implemented
WV0540 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $324 $1,001 Implemented
WV0540 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $60 Implemented
WV0540 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $129 $135 Implemented
AM0722 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149,000 $471,100 Implemented
AM0722 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,000 Implemented
AM0722 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,230 $1,000 Implemented
AM0722 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,000 $0 Implemented
AM0722 # 06 Y:2017 06 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $980 $80 Implemented
AM0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,440 $2,000 Implemented
AM0721 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,960 $0 Implemented
AM0721 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $2,410 Implemented
AM0721 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $670 Implemented
SU0421 # 01 Y:2016 01 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31 $0 Implemented
SU0421 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $340 Implemented
SU0421 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73 $74 Implemented
SU0421 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $3,431 $3,650 Implemented
SU0421 # 06 Y:2016 06 2016 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $848 $3,260 Implemented
SU0421 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $59 $290 Implemented
UD0949 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,312 $5,400 Implemented
UD0949 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Implemented
UD0949 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,996 $57,770 Implemented
WV0527 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,539 $1,100 Implemented
WV0527 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,268 $2,530 Implemented