Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0284 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $479 | $500 | Implemented |
UA0284 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,762 | $8,114 | Implemented |
UA0284 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,690 | $13,427 | Implemented |
UA0206 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $7,065 | $8,101 | Implemented |
UA0206 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $1,372 | Implemented |
UA0140 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,564 | $1,260 | Implemented |
UA0140 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,787 | $1,522 | Implemented |
UA0102 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $2,868 | $3,530 | Implemented |
UA0102 # 10 Y:2013 | 10 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,808 | $295 | Implemented |
UA0102 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,882 | $5,695 | Implemented |
UA0102 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $9,708 | $336 | Implemented |
UA0102 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,898 | $56,750 | Implemented |
UA0102 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,854 | $94,049 | Implemented |
UA0031 # 08 Y:2009 | 08 | 2009 | INSULATE BARE EQUIPMENT | $350 | $610 | Implemented |
UA0031 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,910 | $1,500 | Implemented |
UA0031 # 03 Y:2009 | 03 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $2,044 | $510 | Implemented |
UA0031 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,812 | $41,878 | Implemented |
GT0316 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235 | $645 | Implemented |
GT0316 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $763 | $1,263 | Implemented |
GT0316 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $1,500 | $800 | Implemented |
GT0316 # 01 Y:1987 | 01 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $18,200 | $0 | Implemented |
GT0263 # 01 Y:1985 | 01 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,700 | $82,000 | Implemented |
GT0263 # 06 Y:1985 | 06 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $21,300 | $400 | Implemented |
GT0263 # 05 Y:1985 | 05 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $787 | $3,679 | Implemented |