IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2103 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69,803 $0 Implemented
CL2103 # 05 Y:2021 05 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $349 $520 Implemented
CL2103 # 02 Y:2021 02 2021 PAY UTILITY BILLS ON TIME $812 $0 Implemented
NC0523 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,803 $1,935 Implemented
NC0523 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,179 $50 Implemented
NC0523 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,120 $1,000 Implemented
NC0523 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $176 $200 Implemented
NC0523 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $3,012 Implemented
NC0364 # 07 Y:2007 07 2007 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $48,725 $133,600 Implemented
NC0364 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $684 $500 Implemented
NC0364 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $870 $863 Implemented
NC0364 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,004 $50 Implemented
NC0364 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $51,254 $6,000 Implemented
NC0255 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $213 $240 Implemented
NC0255 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $2,425 $350 Implemented
NC0094 # 09 Y:1996 09 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $11,533 $25,000 Implemented
NC0094 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100 $420 Implemented
NC0094 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,416 $960 Implemented
TN0582 # 01 Y:1996 01 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $25,500 $0 Implemented
TN0582 # 02 Y:1996 02 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $18,000 $8,640 Implemented
TN0582 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,800 $0 Implemented
TN0582 # 07 Y:1996 07 1996 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $8,000 $1,500 Implemented
TN0582 # 08 Y:1996 08 1996 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $6,537 $0 Implemented
TN0582 # 11 Y:1996 11 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,800 $360 Implemented