Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0004 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $224,000 | $9,200 | Not Implemented |
IC0004 # 06 Y:2001 | 06 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $702,000 | $8,500 | Not Implemented |
LM0003 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $1,651 | $4,100 | Not Implemented |
LM0003 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,862 | $0 | Implemented |
LM0003 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,731 | $460 | Implemented |
LM0003 # 04 Y:2001 | 04 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,824 | $0 | Implemented |
LM0003 # 05 Y:2001 | 05 | 2001 | MAINTAIN MACHINES TO REDUCE LEAKS | $750 | $350 | Implemented |
LM0003 # 06 Y:2001 | 06 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $7,268 | $1,500 | Not Implemented |
LM0002 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,192 | $3,285 | Not Implemented |
LM0002 # 02 Y:2001 | 02 | 2001 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,259 | $3,158 | Not Implemented |
LM0002 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,253 | $250 | Implemented |
LM0002 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $508 | $0 | Implemented |
LM0002 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,282 | $12,475 | Not Implemented |
LM0002 # 06 Y:2001 | 06 | 2001 | USE ULTRASONIC CLEANING | $100,100 | $90,000 | Not Implemented |
LM0002 # 07 Y:2001 | 07 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $128,500 | $0 | Implemented |
AM0395 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $9,370 | $14,460 | Not Implemented |
AM0395 # 02 Y:2001 | 02 | 2001 | INSTALL SKYLIGHTS | $5,430 | $11,800 | Not Implemented |
AM0395 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $875 | $580 | Implemented |
AM0395 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,180 | $1,140 | Implemented |
AM0395 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,080 | $100 | Implemented |
AM0395 # 06 Y:2001 | 06 | 2001 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $710 | $703 | Not Implemented |
AM0395 # 07 Y:2001 | 07 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $870 | $445 | Implemented |
AM0395 # 08 Y:2001 | 08 | 2001 | KEEP LAMPS AND REFLECTORS CLEAN | $270 | $750 | Implemented |
LE0101 # 01 Y:2001 | 01 | 2001 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $9,696 | $500 | Implemented |
LE0101 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $26,225 | $30,000 | Implemented |