IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,226

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0334 # 01 Y:1998 01 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $182,000 $200,000 Not Implemented
WI0334 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,225 $500 Implemented
WI0334 # 03 Y:1998 03 1998 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,932 $6,000 Not Implemented
WI0334 # 04 Y:1998 04 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,172 $6,200 n/a
WI0334 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,094 $800 Implemented
WI0334 # 06 Y:1998 06 1998 MINIMIZE WATER USAGE $400 $1,875 Not Implemented
WI0334 # 07 Y:1998 07 1998 COMBINE UTILITY METERS $385 $200 Implemented
ME0254 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,883 $25,900 n/a
ME0254 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,601 $14,083 n/a
ME0254 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,320 $2,600 n/a
ME0254 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $911 $450 n/a
ME0254 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $830 $500 n/a
ME0254 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $300 n/a
ME0254 # 07 Y:1998 07 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $6,872 $17,050 n/a
ME0254 # 08 Y:1998 08 1998 USE OTHER WASTE CONCENTRATION METHODS $6,248 $6,950 n/a
AS0233 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $220 Not Implemented
AS0233 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $524 $60 Not Implemented
AS0233 # 03 Y:1998 03 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $415 $365 Not Implemented
AS0233 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,226 $8,275 Not Implemented
AS0233 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $87 Not Implemented
AS0233 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $368 $60 Not Implemented
AS0233 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $47,175 $480 Implemented
AS0233 # 08 Y:1998 08 1998 APPLY FOR INVESTMENT INCENTIVES $704 $60 Not Implemented
AS0233 # 09 Y:1998 09 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $11,008 $1,480 Implemented
AS0233 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $96,975 $150,000 Implemented