Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
340
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0686 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,360 | $160 | Not Implemented |
OK0667 # 11 Y:2003 | 11 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,265 | $0 | Not Implemented |
OK0667 # 10 Y:2003 | 10 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,803 | $500 | Not Implemented |
OK0667 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $652 | $5,401 | Not Implemented |
OK0667 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,918 | $367 | Not Implemented |
OK0667 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $551 | $2,519 | Not Implemented |
OK0667 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $604 | $643 | Not Implemented |
OK0667 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $931 | $185 | Not Implemented |
OK0667 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,471 | $1,855 | Not Implemented |
OK0667 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $670 | $760 | Not Implemented |
OK0667 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $1,957 | $564 | Not Implemented |
OK0667 # 01 Y:2003 | 01 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,098 | $4,390 | Not Implemented |
OK0610 # 05 Y:2001 | 05 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $312,000 | $150,000 | Not Implemented |
OK0610 # 04 Y:2001 | 04 | 2001 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $2,420 | $1,235 | Not Implemented |
OK0610 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,939 | $16,000 | Not Implemented |
OK0610 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,700 | $1,110 | Not Implemented |
OK0610 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $14,000 | $1,670 | Implemented |
OK0599 # 07 Y:2000 | 07 | 2000 | PURCHASE APPROPRIATELY SIZED MATERIAL | $224,052 | $150 | Not Implemented |
OK0599 # 06 Y:2000 | 06 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $200,000 | $300,000 | Not Implemented |
OK0599 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $89,040 | $0 | Not Implemented |
OK0599 # 04 Y:2000 | 04 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,139 | $12,800 | Not Implemented |
OK0599 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,866 | $1,300 | Not Implemented |
OK0599 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $777 | $3,841 | Not Implemented |
OK0599 # 01 Y:2000 | 01 | 2000 | COMBINE UTILITY METERS | $15,427 | $10,600 | Not Implemented |
OK0597 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,012 | $2,700 | Not Implemented |