IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

340

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0686 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,360 $160 Not Implemented
OK0667 # 11 Y:2003 11 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,265 $0 Not Implemented
OK0667 # 10 Y:2003 10 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,803 $500 Not Implemented
OK0667 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $5,401 Not Implemented
OK0667 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $367 Not Implemented
OK0667 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $551 $2,519 Not Implemented
OK0667 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $604 $643 Not Implemented
OK0667 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $931 $185 Not Implemented
OK0667 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,471 $1,855 Not Implemented
OK0667 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $670 $760 Not Implemented
OK0667 # 02 Y:2003 02 2003 RECOVER AND REUSE WASTE MATERIAL $1,957 $564 Not Implemented
OK0667 # 01 Y:2003 01 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,098 $4,390 Not Implemented
OK0610 # 05 Y:2001 05 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $312,000 $150,000 Not Implemented
OK0610 # 04 Y:2001 04 2001 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,420 $1,235 Not Implemented
OK0610 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $16,000 Not Implemented
OK0610 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,700 $1,110 Not Implemented
OK0610 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $14,000 $1,670 Implemented
OK0599 # 07 Y:2000 07 2000 PURCHASE APPROPRIATELY SIZED MATERIAL $224,052 $150 Not Implemented
OK0599 # 06 Y:2000 06 2000 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $200,000 $300,000 Not Implemented
OK0599 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $89,040 $0 Not Implemented
OK0599 # 04 Y:2000 04 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,139 $12,800 Not Implemented
OK0599 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,866 $1,300 Not Implemented
OK0599 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $777 $3,841 Not Implemented
OK0599 # 01 Y:2000 01 2000 COMBINE UTILITY METERS $15,427 $10,600 Not Implemented
OK0597 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,012 $2,700 Not Implemented