IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

975

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0714 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $1,311 $1,200 Implemented
UD0714 # 10 Y:2005 10 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,296 $0 Implemented
UD0714 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $1,138 $350 Implemented
UD0714 # 15 Y:2005 15 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $884 $0 Implemented
MS0267 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $30,643 $45,270 Implemented
MS0267 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,354 $141,305 Implemented
MS0267 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $228 Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented
MA0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,788 $12,000 Implemented
MA0568 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $5,122 $6,750 Implemented
MA0568 # 05 Y:2005 05 2005 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $4,092 $6,000 Implemented
LM0088 # 03 Y:2005 03 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $7,975 $3,000 Implemented
LM0087 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,069 $17,418 Implemented
LM0087 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,466 $760 Implemented
LM0087 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $377 Implemented
LM0087 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,321 $1,000 Implemented
LM0087 # 08 Y:2005 08 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $19,500 $3,680 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented
IC0090 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,643 $9,400 Implemented
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
CO0555 # 01 Y:2004 01 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $4,790 $13,100 Implemented
CO0555 # 02 Y:2004 02 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $900 $580 Implemented