IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0565 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $810 $1,600 Implemented
WV0565 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $77,310 $17,740 Implemented
WV0565 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $2,854 $533 Implemented
WV0565 # 05 Y:2018 05 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,441 $500 Implemented
NC0619 # 09 Y:2018 09 2018 AVOID REWINDING MOTORS MORE THAN TWICE $3,477 $5,865 Implemented
NC0619 # 08 Y:2018 08 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,721 $500 Implemented
NC0619 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,718 $1,800 Implemented
NC0619 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,617 $100 Implemented
NC0619 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $211 $350 Implemented
MZ0256 # 05 Y:2018 05 2018 USE COMPRESSOR AIR FILTERS $3,317 $7,200 Implemented
MZ0256 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,589 $0 Implemented
IP0095 # 10 Y:2018 10 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,136 $3,970 Implemented
IP0095 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $2,961 $1,093 Implemented
IP0095 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,356 $3,070 Implemented
IP0095 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,255 $11,125 Implemented
IP0095 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,023 $2,041 Implemented
IP0095 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,935 $25 Implemented
GT0902 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $50 $197 Implemented
MZ0234 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,361 $50 Implemented
MZ0234 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,354 $1,550 Implemented
MZ0234 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,800 $0 Implemented
MZ0234 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $407 $2,000 Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented