IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0438 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $467 $936 Implemented
SU0438 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59 $66 Implemented
SU0438 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $449 $600 Implemented
SU0438 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,174 $3,708 Implemented
SD0547 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,853 $20,582 Implemented
SD0547 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $3,679 $11,568 Implemented
SD0547 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,165 $1,500 Implemented
SD0547 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $1,326 $750 Implemented
SD0547 # 07 Y:2017 07 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $689 $567 Implemented
MA0769 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,487 $39,330 Implemented
AM0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,440 $2,000 Implemented
AM0721 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,960 $0 Implemented
AM0721 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $2,410 Implemented
AM0721 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $670 Implemented
WV0527 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,539 $1,100 Implemented
WV0527 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,268 $2,530 Implemented
WV0527 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,524 $60 Implemented
WV0527 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,044 $165 Implemented
WV0527 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $581 $1,275 Implemented
WV0527 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $252 $263 Implemented
WV0527 # 11 Y:2016 11 2016 DEVELOP A REPAIR/REPLACE POLICY $212 $527 Implemented
IP0059 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $58 Implemented
IP0059 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,602 $99 Implemented
IP0059 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $76 $62 Implemented
IP0059 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,345 $3,616 Implemented