IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0721 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $670 Implemented
AM0721 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $2,410 Implemented
AM0721 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,960 $0 Implemented
AM0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,440 $2,000 Implemented
AM0694 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $580 Implemented
AM0693 # 07 Y:2015 07 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $165 $142 Implemented
AM0693 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $247 $863 Implemented
AM0693 # 04 Y:2015 04 2015 DISCONNECT BALLASTS $809 $188 Implemented
AM0693 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
AM0693 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,605 $1,975 Implemented
AM0488 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,600 $150 Implemented
AM0488 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $460 Implemented
AM0488 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Implemented
AM0488 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,290 $6,576 Implemented
AM0488 # 05 Y:2005 05 2005 INSTALL SKYLIGHTS $2,215 $10,700 Implemented
AM0488 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,000 Implemented
AM0488 # 01 Y:2005 01 2005 MODIFY WORKLOAD $12,700 $9,000 Implemented
TA0054 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $316 $0 Implemented
TA0054 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,893 $0 Implemented
TA0054 # 03 Y:2003 03 2003 USE OPTIMUM TEMPERATURE $1,215 $0 Implemented
TA0054 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $1,550 Implemented
TA0054 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $266 $444 Implemented
AM0436 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $950 $0 Implemented
AM0436 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,435 $20 Implemented
AM0436 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $9,700 $33,250 Implemented