Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,117
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0927 # 06 Y:2015 | 06 | 2015 | COMBINE UTILITY METERS | $63,547 | $50,000 | Not Implemented |
UD0927 # 07 Y:2015 | 07 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,280 | $0 | Not Implemented |
MA0745 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,700 | $3,600 | Not Implemented |
MA0745 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,433 | $1,224 | Implemented |
MA0745 # 03 Y:2015 | 03 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,022 | $36,150 | Implemented |
UM0456 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,025 | $1,500 | Implemented |
UM0456 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $21,808 | $17,500 | Implemented |
UM0456 # 03 Y:2015 | 03 | 2015 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,298 | $100 | Not Implemented |
UM0456 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,704 | $10,000 | Implemented |
IP0029 # 01 Y:2014 | 01 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,363 | $210 | Not Implemented |
IP0029 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,383 | $92 | Not Implemented |
IP0029 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $980 | $122 | Not Implemented |
IP0029 # 04 Y:2014 | 04 | 2014 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $82,707 | $12,435 | Not Implemented |
IP0029 # 05 Y:2014 | 05 | 2014 | INSULATE BARE EQUIPMENT | $2,997 | $1,104 | Not Implemented |
IP0029 # 06 Y:2014 | 06 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,419 | $512 | Not Implemented |
IP0029 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,432 | $4,014 | Implemented |
IP0029 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,953 | $54,929 | Implemented |
NC0523 # 01 Y:2014 | 01 | 2014 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,000 | $600,000 | Not Implemented |
NC0523 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $78,330 | $120,000 | Not Implemented |
NC0523 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $58,620 | $90,000 | Not Implemented |
NC0523 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $146,762 | Not Implemented |
NC0523 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,560 | $2,500 | Not Implemented |
NC0523 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $3,012 | Implemented |
NC0523 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $176 | $200 | Implemented |
NC0523 # 08 Y:2014 | 08 | 2014 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $11,195 | $20,000 | Not Implemented |