Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0773 # 06 Y:2017 | 06 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $501 | $100 | Not Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
MA0773 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,564 | $6,660 | Not Implemented |
MA0773 # 03 Y:2017 | 03 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,593 | $10,625 | Implemented |
MA0773 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,580 | $14,050 | Implemented |
MA0773 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,653 | $30,000 | Not Implemented |
MA0769 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $12,391 | $11,273 | Not Implemented |
MA0769 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,487 | $39,330 | Implemented |
MA0769 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,931 | $24,720 | Not Implemented |
MA0769 # 04 Y:2017 | 04 | 2017 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $8,620 | $57,572 | Not Implemented |
MA0769 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,874 | $7,200 | Not Implemented |
MA0568 # 06 Y:2005 | 06 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,459 | $2,888 | Not Implemented |
MA0568 # 05 Y:2005 | 05 | 2005 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $4,092 | $6,000 | Implemented |
MA0568 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,122 | $6,750 | Implemented |
MA0568 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,788 | $12,000 | Implemented |
MA0568 # 02 Y:2005 | 02 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,082 | $7,750 | Implemented |
MA0568 # 01 Y:2005 | 01 | 2005 | ADOPT IN-HOUSE MATERIAL GENERATION | $174,960 | $252,000 | Not Implemented |
MA0470 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $280 | Implemented |
MA0470 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $206 | $450 | Implemented |
MA0470 # 05 Y:2000 | 05 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $1,402 | $280 | Implemented |
MA0470 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,495 | $365 | Implemented |
MA0470 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,099 | $4,500 | Not Implemented |
MA0470 # 02 Y:2000 | 02 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $3,064 | $12,000 | Not Implemented |
MA0470 # 01 Y:2000 | 01 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,970 | $500 | Implemented |
MA0384 # 03 Y:1997 | 03 | 1997 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,089 | $3,215 | Not Implemented |