Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,093
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0195 # 08 Y:2001 | 08 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $838 | $400 | Implemented |
SU0104 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $92 | $0 | Implemented |
SU0104 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $147 | $0 | Implemented |
SU0104 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,030 | $4,460 | Implemented |
WI0405 # 01 Y:2001 | 01 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $5,787 | $4,500 | Implemented |
WI0405 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,749 | $2,000 | Implemented |
WI0405 # 04 Y:2001 | 04 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,138 | $0 | Implemented |
WI0405 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,216 | $500 | Implemented |
BD0193 # 01 Y:2001 | 01 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $68,706 | $29,000 | Implemented |
BD0193 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,275 | $22,875 | Implemented |
BD0193 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,104 | $2,900 | Implemented |
BD0193 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,368 | $2,660 | Implemented |
BD0193 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,352 | $1,000 | Implemented |
BD0193 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $324 | $350 | Implemented |
BD0193 # 13 Y:2001 | 13 | 2001 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $62,772 | $5,000 | Implemented |
UD0632 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $94,812 | $8,000 | Implemented |
UD0632 # 04 Y:2001 | 04 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,915 | $0 | Implemented |
UD0632 # 05 Y:2001 | 05 | 2001 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,264 | $0 | Implemented |
UF0279 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,057 | $10,208 | Implemented |
UF0279 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,241 | $1,520 | Implemented |
UF0279 # 05 Y:2001 | 05 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,260 | $0 | Implemented |
UF0279 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $2,853 | $767 | Implemented |
UF0279 # 08 Y:2001 | 08 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,800 | $0 | Implemented |
UF0279 # 09 Y:2001 | 09 | 2001 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $6,500 | $4,612 | Implemented |
LE0118 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $135 | Implemented |