Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,238
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0165 # 01 Y:1997 | 01 | 1997 | REDUCE SCRAP PRODUCTION | $22,752 | $48 | Implemented |
IA0165 # 02 Y:1997 | 02 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $12,823 | $3,500 | Implemented |
IA0165 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,788 | $12 | Implemented |
IA0165 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,421 | $167 | Implemented |
IA0165 # 07 Y:1997 | 07 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,431 | $1,500 | Implemented |
CO0385 # 01 Y:1997 | 01 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,360 | $6,100 | Implemented |
CO0385 # 02 Y:1997 | 02 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,510 | $400 | Implemented |
CO0385 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,180 | $320 | Implemented |
CO0385 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $322 | Implemented |
CO0385 # 05 Y:1997 | 05 | 1997 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $6,410 | $13,700 | Implemented |
CO0385 # 06 Y:1997 | 06 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,370 | $420 | Implemented |
CO0385 # 07 Y:1997 | 07 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $105,860 | $99,400 | Implemented |
TN0609 # 05 Y:1997 | 05 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $5,330 | $6,200 | Implemented |
IA0164 # 01 Y:1997 | 01 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $32,289 | $800 | Implemented |
IA0164 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $898 | Implemented |
IA0164 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,481 | $268 | Implemented |
IA0164 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,647 | $20 | Implemented |
IA0164 # 06 Y:1997 | 06 | 1997 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,860 | $1,788 | Implemented |
IA0164 # 07 Y:1997 | 07 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $4,848 | $8,000 | Implemented |
IA0164 # 08 Y:1997 | 08 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $5,894 | $100 | Implemented |
IA0164 # 09 Y:1997 | 09 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,114 | $1,200 | Implemented |
MO0199 # 02 Y:1997 | 02 | 1997 | RECOVER AND REUSE COOLING WATER | $20,939 | $19,000 | Implemented |
MO0199 # 03 Y:1997 | 03 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $25,800 | $20,000 | Implemented |
MO0199 # 04 Y:1997 | 04 | 1997 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $18,045 | $15,000 | Implemented |
MO0199 # 05 Y:1997 | 05 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $10,080 | $10,000 | Implemented |