IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0118 # 10 Y:2013 10 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $21 $60 Implemented
MZ0118 # 11 Y:2013 11 2013 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $702 $9,752 Implemented
IP0015 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,644 $0 Implemented
IP0015 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,010 $1,400 Implemented
IP0015 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $7,093 $380 Implemented
IP0015 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,795 $8,625 Implemented
BS0018 # 01 Y:2013 01 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $552 $934 Implemented
BS0018 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,122 $7,317 Implemented
BS0018 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $600 Implemented
OK0859 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,187 $7,856 Implemented
OK0859 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $3,000 Implemented
OK0859 # 10 Y:2013 10 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,170 $30,000 Implemented
OK0859 # 13 Y:2013 13 2013 REDUCE HEAT GAIN BY WINDOW TINTING $3,200 $6,500 Implemented
OK0859 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $372 $0 Implemented
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
MZ0115 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,027 $1,600 Implemented
MZ0115 # 04 Y:2013 04 2013 ELIMINATE/REDUCE AN OPERATION $11,784 $0 Implemented
MZ0115 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,874 $204,750 Implemented
MZ0115 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,543 $1,160 Implemented
MZ0115 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,362 $1,500 Implemented
MZ0115 # 10 Y:2013 10 2013 CONDENSE OPERATION INTO ONE BUILDING $99,466 $35,000 Implemented
AM0642 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,225 $0 Implemented
AM0642 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,950 $560 Implemented
AM0642 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,645 $2,652 Implemented