IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0276 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,109 $57,867 Implemented
UA0276 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,633 $8,591 Implemented
UA0276 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,760 $35,064 Implemented
UA0252 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $32,927 $257 Implemented
UA0252 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $13,657 $8,080 Implemented
UA0252 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,634 $850 Implemented
UA0249 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,396 $17,269 Implemented
UA0249 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,261 $8,080 Implemented
UA0249 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $320 $20 Implemented
UA0231 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,885 $500 Implemented
UA0231 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $538 $121 Implemented
UA0231 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,948 $4,200 Implemented
UA0229 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,562 $6,700 Implemented
UA0229 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,905 $2,000 Implemented
UA0183 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,700 $31,835 Implemented
UA0183 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $500 Implemented
UA0183 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,373 $1,365 Implemented
UA0153 # 04 Y:2016 04 2016 USE PHOTOCELL CONTROLS $329 $118 Implemented
UA0153 # 08 Y:2016 08 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $537 $0 Implemented
UA0153 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $25,593 $4,000 Implemented
UA0122 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $7,195 Implemented
UA0122 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,196 $100 Implemented
UA0092 # 03 Y:2013 03 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $25,845 $25,121 Implemented
UA0092 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,460 $6,200 Implemented
UA0092 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,421 $135 Implemented