IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0281 # 05 Y:2000 05 2000 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $80,452 $92,000 Implemented
ME0281 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,277 $300 Implemented
ME0281 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,461 $50 Implemented
ME0277 # 07 Y:1999 07 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $711 $0 Implemented
ME0277 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $150 Implemented
ME0277 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,530 $17,411 Implemented
ME0277 # 01 Y:1999 01 1999 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,431 $1,766 Implemented
ME0277 # 08 Y:1999 08 1999 INSTALL BACK-UP EQUIPMENT $516 $300 Implemented
ME0264 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,149 $1,000 Implemented
ME0263 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,208 $4,185 Implemented
ME0263 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,192 $800 Implemented
ME0263 # 08 Y:1999 08 1999 PAY BILLS ON TIME TO AVOID LATE FEES $507 $0 Implemented
ME0263 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,243 $2,041 Implemented
ME0263 # 10 Y:1999 10 1999 REDUCE OR ELIMINATE WASTE $1,040 $150 Implemented
ME0234 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $38,400 $50,000 Implemented
ME0234 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,482 $4,476 Implemented
ME0234 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,979 $12,932 Implemented
ME0234 # 10 Y:1998 10 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,114 $7,000 Implemented
ME0234 # 07 Y:1998 07 1998 RECOVER AND REUSE COOLING WATER $12,512 $12,000 Implemented
ME0234 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $500 Implemented
ME0234 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,153 $10,580 Implemented
ME0234 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,284 $800 Implemented
ME0242 # 08 Y:1998 08 1998 USE OPTIMUM THICKNESS INSULATION $90 $160 Implemented
ME0242 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $591 $2,260 Implemented
ME0242 # 05 Y:1998 05 1998 USE OPTIMUM THICKNESS INSULATION $1,126 $1,700 Implemented