IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0768 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $14,590 $4,725 n/a
GT0717 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,765 $16,300 Implemented
GT0717 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $10,500 Implemented
GT0717 # 03 Y:2001 03 2001 COVER OPEN TANKS $17,390 $4,510 Not Implemented
GT0717 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,475 $4,275 Not Implemented
GT0717 # 05 Y:2001 05 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,600 $0 Not Implemented
GT0717 # 06 Y:2001 06 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,465 $67,250 Implemented
GT0717 # 07 Y:2001 07 2001 FILTER AND REUSE HYDRAULIC OIL $1,030 $1,000 Implemented
GT0717 # 08 Y:2001 08 2001 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,000 $25,180 Implemented
GT0717 # 09 Y:2001 09 2001 INSTALL BACK-UP EQUIPMENT $7,200 $29,314 Implemented
TN0660 # 01 Y:1999 01 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $56,525 $880 Implemented
TN0660 # 02 Y:1999 02 1999 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $20,100 $50,000 Implemented
TN0660 # 03 Y:1999 03 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,247 $4,700 Implemented
TN0660 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,450 $0 Not Implemented
TN0660 # 05 Y:1999 05 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,360 $1,070 Implemented
TN0660 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,300 $8,200 Implemented
TN0609 # 01 Y:1997 01 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $83,060 $19,080 Not Implemented
TN0609 # 02 Y:1997 02 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $64,970 $45,880 Not Implemented
TN0609 # 03 Y:1997 03 1997 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $10,970 $5,080 Not Implemented
TN0609 # 04 Y:1997 04 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $8,030 $20,880 Not Implemented
TN0609 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $5,330 $6,200 Implemented
TN0609 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $600 Not Implemented
NC0089 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,208 $690 Implemented
NC0089 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $761 $0 Not Implemented
NC0089 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,464 $260 Not Implemented