IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0691 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $0 Implemented
OK0691 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $254 $760 Not Implemented
OK0691 # 07 Y:2004 07 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $886 $139 Implemented
OK0645 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,346 $2,900 Not Implemented
OK0645 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,887 $220 Implemented
OK0645 # 03 Y:2002 03 2002 MODIFY WORKLOAD $10,443 $5,600 Not Implemented
OK0645 # 04 Y:2002 04 2002 MOVE PRODUCT USING MECHANICAL MEANS $22,600 $10,000 Not Implemented
OK0645 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $176 $163 Implemented
OK0645 # 06 Y:2002 06 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $61,280 $44,000 Implemented
OK0636 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,565 $16,300 Implemented
OK0636 # 02 Y:2002 02 2002 COVER OPEN TANKS $2,412 $528 Not Implemented
OK0636 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,525 $1,500 Not Implemented
OK0636 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $175,200 $12,800 Implemented
OK0636 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,410 $1,400 Implemented
OK0636 # 06 Y:2002 06 2002 BURN WOOD BY-PRODUCTS FOR HEAT $15,400 $22,800 Not Implemented
OK0622 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,626 $2,120 Implemented
OK0622 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,659 $1,089 Implemented
OK0622 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,700 $654 Implemented
OK0622 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,944 $100 Not Implemented
OK0622 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $2,788 $288 Not Implemented
OK0622 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,100 $152,055 Implemented
OK0622 # 07 Y:2001 07 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $635,180 $125,000 Implemented
KU0552 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $600 Not Implemented
KU0552 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $699 $725 Not Implemented
KU0552 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $206 Not Implemented