Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
236
matching recommendationsSIC | 351 | Engines And Turbines |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0112 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,630 | $2,600 | Implemented |
MZ0113 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,882 | $1,698 | Implemented |
MZ0113 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $545 | $902 | Implemented |
MZ0113 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $620 | Implemented |
MZ0113 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $1,050 | Implemented |
MZ0113 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $3,575 | $3,500 | Implemented |
MZ0113 # 05 Y:2013 | 05 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,613 | $4,973 | Implemented |
MZ0113 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,620 | $900 | Implemented |
MZ0113 # 07 Y:2013 | 07 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,948 | $50 | Implemented |
MZ0113 # 03 Y:2013 | 03 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $7,609 | $1,000 | Implemented |
MZ0113 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,414 | $8,758 | Implemented |
IA0497 # 01 Y:2013 | 01 | 2013 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $19,923 | $46,094 | Implemented |
IA0497 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,214 | $1,720 | Implemented |
IA0497 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,468 | $1,500 | Implemented |
IA0493 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112,998 | $128,338 | Implemented |
IA0493 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,452 | $2,000 | Implemented |
IA0493 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,291 | $105 | Implemented |
MZ0097 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,968 | $450 | Implemented |
MZ0097 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,305 | $35,000 | Implemented |
LL0314 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $149,374 | $64,560 | Implemented |
LL0314 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $74,110 | $7,510 | Implemented |
LL0314 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,119 | $770 | Implemented |
LL0314 # 04 Y:2009 | 04 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,010 | $1,350 | Implemented |
MI0178 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,282 | $40 | Implemented |
MI0178 # 06 Y:2009 | 06 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,908 | $4,531 | Implemented |