Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
306
matching recommendationsSIC | 3532 | Mining Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0025 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,405 | $13,567 | Implemented |
UU0025 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $3,455 | $3,500 | Implemented |
UU0025 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,913 | $260 | Implemented |
UU0025 # 04 Y:2002 | 04 | 2002 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $1,056 | $0 | Implemented |
UU0025 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,177 | $1,760 | Implemented |
UU0025 # 06 Y:2002 | 06 | 2002 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,285 | $30 | Implemented |
SU0114 # 01 Y:2001 | 01 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,000 | $24,320 | Not Implemented |
SU0114 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $508 | $0 | Implemented |
SU0114 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,310 | $30 | Implemented |
SU0114 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,977 | $1,030 | Not Implemented |
SU0114 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $88 | $115 | Not Implemented |
SU0114 # 06 Y:2001 | 06 | 2001 | CONVERT TO ELECTROSTATIC POWDER COATING | $3,823 | $6,930 | Not Implemented |
WI0399 # 01 Y:2001 | 01 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $31,173 | $2,000 | Not Implemented |
WI0399 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,170 | $8,874 | Not Implemented |
WI0399 # 03 Y:2001 | 03 | 2001 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $24,740 | $0 | Not Implemented |
WI0399 # 04 Y:2001 | 04 | 2001 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $10,208 | $4,500 | Not Implemented |
WI0399 # 05 Y:2001 | 05 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,894 | $62,046 | Not Implemented |
WI0399 # 06 Y:2001 | 06 | 2001 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $6,914 | $4,000 | Not Implemented |
WI0399 # 07 Y:2001 | 07 | 2001 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $6,301 | $0 | Not Implemented |
WI0399 # 08 Y:2001 | 08 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,805 | $11,500 | Not Implemented |
WI0399 # 09 Y:2001 | 09 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,549 | $0 | Not Implemented |
WI0399 # 10 Y:2001 | 10 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,149 | $2,009 | Not Implemented |
WV0168 # 01 Y:1999 | 01 | 1999 | INSULATE BARE EQUIPMENT | $5,946 | $5,087 | Implemented |
WV0168 # 02 Y:1999 | 02 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $15,153 | $38,400 | Not Implemented |
WV0168 # 03 Y:1999 | 03 | 1999 | USE SYNTHETIC LUBRICANT | $1,216 | $1,300 | Implemented |