Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
Reset
SIC 3541 Machine Tools, Metal Cutting Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0678 # 07 Y:2025 07 2025 INSTALL OCCUPANCY SENSORS $843 $2,979 n/a
SD0678 # 06 Y:2025 06 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $14,843 $23,800 n/a
SD0678 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $156 $424 n/a
SD0678 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $947 $3,752 n/a
SD0678 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,200 $3,396 n/a
SD0678 # 03 Y:2025 03 2025 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $50,863 $545,300 n/a
SD0678 # 04 Y:2025 04 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,339 $25,895 n/a
WM0213 # 02 Y:2024 02 2024 USE RADIANT HEATER FOR SPOT HEATING $3,521 $16,500 Not Implemented
WM0213 # 04 Y:2024 04 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,240 $2,590 Implemented
WM0213 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $2,965 $267 Not Implemented
WM0213 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,049 $125 Implemented
WM0213 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $463 $1,730 Not Implemented
WM0213 # 01 Y:2024 01 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,341 $20,389 Implemented
MZ0307 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $6,233 Implemented
MZ0307 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,351 $1,250 Not Implemented
MZ0307 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $1,130 Implemented
MZ0202 # 07 Y:2016 07 2016 CONDENSE OPERATION INTO ONE BUILDING $7,503 $0 Not Implemented
MZ0202 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,101 $70,000 Not Implemented
MZ0202 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,654 $5,000 Not Implemented
MZ0202 # 06 Y:2016 06 2016 CONDENSE OPERATION INTO ONE BUILDING $3,585 $0 Not Implemented
MZ0202 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,180 $27,600 Not Implemented
MZ0202 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $9,678 $45,000 Not Implemented
MZ0202 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,722 $7,341 Not Implemented
MZ0202 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,839 $3,225 Not Implemented
SU0374 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $161 $615 Not Implemented