IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,577

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0445 # 06 Y:2003 06 2003 REUSE RAGS UNTIL COMPLETELY SOILED $1,400 $0 Not Implemented
AM0445 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $380 Implemented
NC0262 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,471 $10,000 Not Implemented
NC0262 # 02 Y:2003 02 2003 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $33,773 $55,000 Not Implemented
NC0262 # 03 Y:2003 03 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,320 $5,653 Not Implemented
NC0262 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,339 $50 Not Implemented
NC0262 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,272 $5,225 Not Implemented
NC0262 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,284 $800 Not Implemented
CO0526 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $21,790 $37,580 Implemented
CO0526 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,240 $33,710 Implemented
CO0526 # 03 Y:2003 03 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $8,350 $1,640 Not Implemented
CO0526 # 04 Y:2003 04 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,180 $3,150 Implemented
CO0526 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,602 $5,670 Implemented
CO0526 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,060 $580 Not Implemented
CO0526 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $6,640 Not Implemented
CO0526 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $980 $3,300 Implemented
CO0526 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $586 Not Implemented
WI0435 # 01 Y:2003 01 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $149,500 $120,000 Not Implemented
WI0435 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,988 $0 Implemented
WI0435 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,286 $10,000 n/a
WI0435 # 04 Y:2003 04 2003 UPGRADE CONTROLS ON COMPRESSORS $1,321 $5,000 Implemented
WI0435 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $691 $640 Not Implemented
LE0138 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $311 $500 Not Implemented
LE0138 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $27,336 $6,800 Not Implemented
LE0138 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $147 Not Implemented